Crystal Lake Hatchery
Marble Construction and design team worked with SSRAA to design and install a new incubation building and generator shed after the existing buildings were destroyed in a fire in March 2014. The found ...
Burnett Inlet Hatchery
Partnership with Pool Engineering to install a new dock and metal building for SSRAA. From to preliminary design meetings to completion, the project was completed in 8 months. The metal building was ...
Trident – Kodiak Freezer Plant
46,000 SF Metal Building with full mezzanine. The design/build project included the complete demolition of an existing fish processing plant, over 2,000 cubic yards of new concrete poured and the ere ...
Berth 4 Commercial Building
Marble Construction started this 18,800 SF Commercial building in August of 2014 and it was complete prior to the 2015 summer tourist season.
FAA Weather Tower 2014
Tower & Building Construction for FAA Weather Camera Site – Harris River, Alaska 2014
Kasaan Community Center 2014
Client: Organized Village of Kasaan (OVK) Contact: Jonathan Wunrow This design build project features many locally sawn timbers and included working with tribal members who hand adz exterior round ...
Napa Auto Parts – Design/Build New Retail Store 2013-2014
Marble Construction completed a 15,475 Square Foot Metal Building with a Mezzanine on time and in budget in early 2014. The building included an insulated metal panel wall and roof system.
Custom Built Home – Ketchikan, Alaska 2011-2013
The Sande home features 5 Star Energy Construction with such features as a wood pellet fired hot water hydronic system, heat recovery ventilators and custom craftsmanship including round log stairs an ...
Hiatt – 4 Plex Building 2013-2014
The Hiatt rental unit is affordably built taking advantage of materials that are both cost effective and offer low maintenance. The unit was designed to meet moderate level incomes and would be simila ...